On Grade LLCOn GradeExcavation & Site Prep
Graded building pad beside a long dark pole barn with equipment on site
Pole Barn Pads · Cloverdale

Pole Barn Pads in Cloverdale, IN

Cleared, compacted and drained pads in Cloverdale for a pole barn, a shop or a machine shed, ready before the builder turns up.

  • Free estimates
  • Based in Greencastle, Indiana
  • One crew, first cut to final grade

Tell us about the job

Free estimates. Travis will get back to you.

Pole Barn Pads · Cloverdale

Pole Barn Pads in Cloverdale

From the spot to the pad

We walk the spot first. Then the footprint is cleared and grubbed, the topsoil is stripped, and the pad is cut and filled to the height the builder asks for. Stone goes on if the plan calls for it.

Fill goes in compacted layers on dry ground. Soft spots are dug out, not covered.

Farm ground and rural work

Much of the county is working farmland, and that brings its own list: field entrances that have to carry loaded grain trucks, lanes that wash out every spring, drainage tile that was laid generations ago and is failing quietly, ponds, and pads for machine sheds. Old tile is the one to watch — it is rarely mapped, it is still doing a job, and cutting one without repairing it puts water into somebody's field.

Farm ground north of I-70

Above the interchange US 231 widens to four lanes and then narrows again on the way up to Greencastle, and State Road 42 crosses it in Cloverdale Township. Much of the land along these roads is flat field ground being sold off in pieces. A new house there is usually a simpler dig than one on the lake side, but flat land drains slowly, and old field tile tends to turn up right where the basement is going.

When we hit tile, we find where it runs and reconnect it or reroute it around the house. Cutting it and walking away leaves a wet basement for you or standing water in the neighbor's field. A drive coming off a state road or county road needs an entrance that takes the ditch water under it, which is where a correctly sized culvert earns its keep. Our driveway culvert guide covers what to ask for.

Ask the county first

Ask the county planning or building office and the county surveyor before you clear. The footprint is fully grubbed, with working room for the builder, because mulching leaves roots.

Indiana 811 is contacted at least two full working days before the pad is cut. Private lines, such as power to an existing shed, are not marked by that locate.

How the job gets priced

Travis takes the calls, looks at the spot and prices the job. Where a job is simple enough to price from photographs, we do that and save you the wait. Estimates are free.

Cloverdale is in Putnam County, where the equipment sits overnight. The rest of our work in town is on the Cloverdale page, and the building & barn pads page covers the service across Central Indiana.

Graded stone strip along the base of a dark metal building wall
Main service page

Building Pad & Pole Barn Pad Preparation in Central Indiana: A cleared, compacted and drained pad for a house, a pole barn or a machine shed, ready before the builder turns up. Based in Greencastle.

How it goes

From the first call to the final grade.

Call or text Travis

The address, roughly what you are trying to do, and when you need it.

A look at the ground

Most jobs need a look. Travis will arrange a time to come out, walk the ground with you and give you a number.

Located before digging

Anything that breaks ground gets located through Indiana 811 first.

One crew, start to finish

The person who strips the site is the person who sets the final grade.

On the ground

Photos of the work.

Every photograph on this site is a job On Grade did. Nothing is stock and nothing is staged. See more work. Or read about the full building & barn pads service.

Stripped and levelled ground behind a metal building, staked and ready
Compacted base running the full length of a metal building
Levelled and compacted pad with materials staged at the edge
Can you build a pad on sloping ground?

Yes. The high side is cut and the low side is filled in compacted layers, and the pad is shaped so water runs around it.

Does the topsoil have to come off first?

Yes. Topsoil holds water and settles, so it is stripped from the footprint and saved for the finish.

Can trees just be mulched where a pole barn is going?

No. Mulching leaves roots. The footprint and the working room around it are fully grubbed.

Does On Grade do pole barn pads in Cloverdale?

Yes. Cloverdale is in Putnam County, where the equipment sits overnight. Travis looks at the job and gives you one figure. Estimates are free.

Get a number

Free estimate in Cloverdale.

Call or text Travis with the address and what you are trying to do.

Greencastle, Indiana · Putnam, Hendricks, Boone and Marion counties

Get a number

Free estimates. Travis will get back to you.

Free estimates. Straight answers.

Call or text Travis with the address and what you are trying to do.

Call TravisFree Estimate