On Grade LLCOn GradeExcavation & Site Prep
Graded building pad beside a long dark pole barn with equipment on site
Service

Building Pad & Pole Barn Pad Preparation in Central Indiana

On Grade LLC prepares building pads and pole barn pads in Central Indiana: cleared, compacted and drained for a house, a pole barn or a machine shed, ready before the builder turns up. Free estimates: call or text Travis at (317) 203-8928.

  • Free estimates
  • Based in Greencastle, Indiana
  • One crew, first cut to final grade

Tell us about the job

Free estimates. Travis will get back to you.

What it includes

What the job covers

  • Walk the spot
  • Clear and grub the footprint
  • Strip the topsoil
  • Cut and fill
  • Shape it for water
  • Stone, if the plan calls for it

The work

What building pad and pole barn pad preparation is

Building pad and pole barn pad preparation is the groundwork that turns a piece of field, yard or woods into a flat, firm, drained base for a building. On Grade LLC builds pads out of Greencastle for houses, pole barns and machine sheds, and for commercial buildings.

A pad is one part of site preparation. It gets its own page because it is the part people ask about most, and the part that is hardest to put right once a building is standing on it.

Step by step

How a building pad gets built

1. Walk the spot

We look at where the building is going, how the ground falls, where water runs now and how trucks will get in. Buried utilities are located through Indiana 811 before anything is dug. That takes two full working days, so allow for it.

2. Clear and grub the footprint

Trees, brush, stumps and roots come out from under the building. Mulching is not enough here, because it leaves the roots in the ground. See land and lot clearing.

3. Strip the topsoil

Topsoil is soft and full of organic matter, so it does not stay under a pad. We pile it to one side and use it at the end for the finish grade and seed.

4. Cut and fill

High ground is cut down and low ground is filled. Fill is placed in layers and each layer is compacted before the next goes on. A soft pocket found under the topsoil is dug out and replaced, not bridged over.

5. Shape it for water

The ground around the pad is graded to fall away from the building. Where water already crosses the site, it gets a swale to follow so it does not end up against a wall.

6. Stone, if the plan calls for it

Where the building gets a concrete floor or apron, stone is brought in, compacted and levelled so the slab is poured at an even thickness. See concrete preparation.

Graded stone strip along the base of a dark metal building wall

Pole barns

Pole barn pads, and clearing for one

A pole barn usually goes on farm ground or at the back of a rural lot. That brings two things to watch. Old field tile often runs under ground that was farmed, and it is not part of an 811 locate. A wooded corner has to be cleared and grubbed before it can carry a pad.

Tell us who is putting the building up and what they have asked for: the finished height, how level it has to be, and whether they want stone under the floor. We build the pad to that. The pad is our part of the job. The building goes up after we leave.

A barn also needs a way in. We can cut and stone the drive, the apron in front of the doors and a turnaround in the same visit. See driveway installation and finish grading.

The price

What changes the job

There is no price list here, because two pads the same size can be very different jobs. These are the things that move it.

How much the ground falls

A pad on a slope needs more cut on the high side and more compacted fill on the low side than one on level ground.

What is under the topsoil

Firm ground is quick. Soft or wet ground has to be dug out and replaced. In parts of Putnam County limestone sits close to the surface, and that changes how a cut is made.

Where the fill comes from

A pad that balances its own cut and fill needs little trucking. One that needs material hauled in or hauled away costs more.

Access and weather

Trucks need a way in and somewhere to turn. Wet ground slows all of it down.

A compaction standard

If a geotechnical report sets a compaction figure, we build to it and the testing firm checks the layers as they go in.

Size of the disturbed area

A site that disturbs an acre or more comes under Indiana's Rule 5 stormwater requirements. Erosion controls go in before the ground is opened.

Where

Where we build pads

On Grade is based in Greencastle. A pad for a pole barn or a machine shed is everyday work across Putnam County, where the machines sit overnight. We also build pads across Hendricks County and Boone County and east into Indianapolis.

For a larger building, see commercial and industrial sitework. If the spot is wooded and in Putnam County, start with land clearing in Greencastle and Putnam County.

On the ground

Pad work, photographed

Every photograph on this site is a job On Grade did. Nothing is stock and nothing is staged.

How it goes

From the first call to the final grade.

Call or text Travis

The address, roughly what you are trying to do, and when you need it.

A look at the ground

Most jobs need a look. Travis will arrange a time to come out, walk the ground with you and give you a number.

Located before digging

Anything that breaks ground gets located through Indiana 811 first.

One crew, start to finish

The person who strips the site is the person who sets the final grade.

Where we do it

Building & Barn Pads across Central Indiana

Based in Greencastle, Putnam County, Indiana, and working east through Hendricks and Boone counties into Indianapolis. See every service area.

On the ground

Pad work, photographed

Every photograph on this site is a job On Grade did. Nothing is stock and nothing is staged.

Graded building pad beside a long dark pole barn with equipment on site
A graded building pad beside a long pole barn.
Vertical cut into a snow-covered bank with a levelled working platform graded out below
A bank cut back in winter, with a level working platform graded out below it.
Levelled and compacted pad with materials staged at the edge
A levelled and compacted pad with materials staged at the edge.
Stripped and levelled ground behind a metal building, staked and ready
Compacted base running the full length of a metal building
Can you build a pad on sloping ground?

Yes. The high side is cut down and the low side is filled in compacted layers until the pad is level. The ground above it is shaped so water runs around the building and not across the pad.

Does the topsoil have to come off first?

Yes. Topsoil is soft and it settles, so it is stripped from under the building and piled to one side. It goes back on at the end for the finish grade and seed.

Can trees just be mulched where a pole barn is going?

No. Mulching leaves the roots in the ground, and roots under a pad rot and let it settle. The footprint has to be cleared and grubbed, and the stump holes filled and compacted. Mulching is fine for the ground around the building.

Do you put in the drive to the building as well?

Yes. The same crew can cut and stone the drive, the apron and a turnaround while the machines are on site.

How do I get a price for a building pad?

Call or text Travis with the address, the size of the building and when the builder is due. Most pads need a look, because the fall of the ground and what is under the topsoil decide the job. Estimates are free.

Everything else

Other work we take on.

Poured foundation wall at a new house with backfill being worked along its face01

Excavation & Foundation Services

Basement digs, footings, foundation excavation and backfill for new builds and additions across Indianapolis and Central Indiana.

Learn more
Wide stripped and levelled field ready for building layout02

Site Preparation & Construction Site Work

Clearing, stripping, cutting and rough grading a site so the builder can start on schedule.

Learn more
View over the bucket while cutting an access track up a wooded slope, brush and timber pushed back on both sides03

Land Clearing, Lot Clearing & Forestry Mulching

Lot clearing for new builds, brush clearing on overgrown ground, and forestry mulching that leaves the chip on site.

Learn more
Long gravel driveway sweeping in a curve toward a single-storey home04

Driveway Installation & Finish Grading

New stone drives, regrading washed-out drives, and the finish grade that decides whether water runs off or sits.

Learn more
Long green drainage pipe run laid in an open trench beside a house05

Drainage, Culvert & Utility Installation

Culverts, tile, catch basins and utility trenching — moving water off the property and services onto it.

Learn more
Finished pond with smooth graded banks under a broken sky06

Pond Construction & Excavation

Digging, shaping and sealing farm and property ponds, with the spoil put to work rather than hauled off.

Learn more
Komatsu excavator working close alongside a house during demolition07

Concrete Preparation & Demolition

Stone, forms and a flat compacted base for the pour — and tearing out what has to come up first.

Learn more
Smooth graded and raked yard in front of a red barn ready for seed08

Seeding, Straw & Site Restoration

The last pass: shaping topsoil, seed and straw, and leaving the ground looking like nobody dug it up.

Learn more
Yellow fire hydrant set in an open excavation with stone bedding around the riser09

Commercial & Industrial Sitework

Pads, parking, drainage and mass grading for commercial builds across Indianapolis and Central Indiana.

Learn more
Cleared slope beside a house stripped back to bare soil10

Forestry Mulching in Putnam & Hendricks County, IN

Brush and small timber taken down to chip and left on the ground as cover. No burn pile and nothing to haul. Based in Greencastle.

Learn more
Freshly spread and rolled driveway stone running between mature trees11

Gravel Driveway Repair & Regrading in Central Indiana

Ruts, potholes and washouts fixed at the cause, not hidden under one more load of stone. Based in Greencastle.

Learn more
Get a number

Pad to build?

Call or text Travis with the address, the building size and when the builder is due.

Greencastle, Indiana · Putnam, Hendricks, Boone and Marion counties

Get a number

Free estimates. Travis will get back to you.

Free estimates. Straight answers.

Call or text Travis with the address and what you are trying to do.

Call TravisFree Estimate